Aside from construction of new buildings, the company has been active in A&A works / upgrading works throughout the years. Armed with a team of experienced professionals dedicated to this work category, the company has completed various A&A projects with clients such as Ministry of Education (MOE) and Housing and Development Board (HDB). The company currently possesses a L6 grading under the Interior Decoration and Finishing works workhead.
MOE
Chongzheng Primary School / Yumin Primary School
Proposed Additions and Alterations to Chongzheng Primary School and Yumin Primary School
Project Size: $17,77 million
Greenwood Primary School / Qihua Primary School / Xinmin Primary School / Xinmin Secondary School
Proposed Additions And Alterations To Greenwood Primary School, Qihua Primary School, Xinmin Primary School & Xinmin Secondary School
Project Size: $33.63 million
Evergreen Primary School
Proposed Additions & Alterations To Existing Evergreen Primary School At 31 Woodlands Circle
Project Size: $18.6 million
Paya Lebar Methodist Girl School (Primary)
Proposed Upgrading Of Paya Lebar Methodist Girls’ School (Primary) At 298 Lorong Ah Soo
Project Size: $14.18 million
HDB
D&B of Upgrading Projects (G11E)
Design & Build Of Upgrading Projects For G11E
Project Size: $25.97 million
D&B of Upgrading Projects (G12E)
Design & Build Of Upgrading Projects For G12E (Stage 2)
Project Size: $26.3 million
LUP Bulk Contract 50
Building Works For Lift Upgrading Programme – Lup Bulk Contract 50
Project Size: $20.64 million
LUP Bulk Contract 60
Building Works For Lift Upgrading Programme – Lup Bulk Contract 60
Project Size: $19.12 million
Erection of Grid-tier Solar Photovoltaic system (CIGS – 1Mwp)
Solar Leasing Of Grid-tier Solar Photovoltaic System For Hdb Residential Blocks -cigs/Cis 1 Mwp
Project Size: $3.3 million
LUP at Tanjong Pagar Plaza Blocks 1 to 5
Building Works For The Lift Upgrading Programme At Tanjong Pagar Plaza Blocks 1 To 5
Project Size: $4.96 million
D&B of Upgrading Projects (G16C)
Design And Build Of Upgrading Projects For G16C
Project Size: $34.66 million
D&B of Upgrading Projects (G22D)
Design And Build Of Upgrading Projects For G22D
Project Size: $25.77 million
D&B of Upgrading Projects (G23C)
Design And Build Of Upgrading Projects For G23C
Project Size: $23.77 million
Multi-storey Carparks (Batch 12)
Addition And Alteration Works To Multi-storey Carparks (Batch 12)
Project Size: $8.2 million
NEA
Hawker Centres Upgrading Programme (Batch 4)
Proposed Additions & Alterations to Existing Single Storey Market (Block 92), Existing Single Storey Food Centre (Block 90 & 91) and Addition of 1 No. of ESS at Whampoa Drive (Hawker Centres Upgrading Programme – Batch 4)
Project Size: $6.86 million